Development House, Shoreditch
In March 2016, architects Waugh Thistleton revealed plans for a timber-framed office block in London’s Shoreditch.
The new nine-storey structure, covering 8,000 sq. m, is intended to replace the existing Development House at Leonard Circus and when completed will be one of London’s tallest modern timber-framed buildings.
The project highlights timber’s continuing resurgence as a building material, with Waugh Thistleton director Andrew Waugh suggesting “this is the beginning of the timber age”.
The building will utilise two types of engineered wood – glued laminated timber, or glulam as it is commonly known, which is made by layering and gluing multiple slices of wood together; and cross-laminated timber which involves arranging layers at right angles. Both have the advantage of being significantly stronger than regular timber.
The structure will be organised around a central core, and is divided into five quadrants. There will be a large ground level foyer as well as a series of vertical slices with sections of glazing around the perimeter offering light and ventilation. This will also allow passersby to see the timber floor plates through the windows.
Andrew Waugh said, “building in timber offers a number of advantages, including minimised time on site, and associated sound and waste disturbance. This translates to less impact on adjacent occupiers, street users and surrounding community.”
"This is a really exciting scheme that can transform one of the key development sites in Shoreditch by creating a truly iconic building," said Conrad Peberdy, director for property developer Ethical Property.
Other new London buildings to exploit timber include a 33-metre-high apartment block, also in Shoreditch, and a house for artist Richard Woods.
Renderings by ForbesMassie.
For more information, see Waugh Thistleton
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.